Residue-to-Asset Diagnostics

Mottainai 5.0

A 2-day executive feasibility diagnostic to determine whether your residue streams can be converted in situ into engineered products that displace current purchases—turning residue liabilities into balance sheet assets.

Implementation

Joint-Venture

What this is

Identify and mitigate the Double-Spend.

Most organizations pay twice for materials: once to buy inputs, and again to remove the residues they generate. This Diagnostic provides a decision-grade feasibility package concluding with one recommendation: Proceed, Pause, or No-Go—with reasons, quantified ranges, and the minimum conditions required to change the decision.


Who it is for

We work exclusively with agro-businesses and industrial enterprises.

Operators who have

  • meaningful, recurring organic, fibrous, polymer-based, or similar residue streams (volume + continuity),

  • a plausible internal-use displacement opportunity (pallets, crates, boards, rigid parts, logistics components, and many more),

  • decision makers who want an economically grounded path to in-situ conversion.


What you receive

Deliverables

  • Residue Asset Map
    Streams, volumes (ranges), variability, contamination, handling/storage constraints.

  • Value Case (ranges with assumptions)
    Cost avoidance and input displacement potential; key sensitivity drivers.

  • Solution Selection
    Fit to ReMatter™ model (Agro / Pack / Tex) + recommended Cell class (throughput, footprint, utilities, staffing concept).

  • Risk & Compliance Snapshot
    Feedstock, operational and permitting considerations; critical unknowns to resolve.

  • 90-Day Roadmap
    Phased plan and gates from feasibility to pilot/engineering and commissioning.


How it works

Engagement

  • Remote Preparation

    Document review & preparation call

  • Onsite
    2 working days (walkthrough, interviews, residue verification, executive readout)

  • Final Diagnostics Report & Executive Recommendation

    Delivered within 10 business days after onsite (or after receipt of required data).


Investment

Terms

  • Investment
    EUR 8,000 fixed fee (Executive Diagnostics)

  • Travel
    Billed at cost, pre-approved (airfare, local transport, lodging)

  • Terms
    70% upfront, 30% due before release of the final report

  • Decision Integrity

    If the loop conditions, end-of-life logic, or economics do not meet minimum feasibility thresholds, the Diagnostic will conclude with a No-Go recommendation and specify what must change to move to Proceed.

Apply for the Diagnostics assessment, request the Residue Intake Form, and schedule the pre-call.


Validate Before You Build

We work with executives, partners, and operators on feasibility, economics, and execution.

We work with executives, partners, and operators on feasibility, economics, and execution. Every industrial engagement begins with the Diagnostic Assessment to quantify the engineering reality and economic potential of your residue stream. Secure the data required to de-risk your investment.

NATURE2WORLD PTE. LTD.

10 ANSON ROAD

#33-10C

INTERNATIONAL PLAZA

SINGAPORE 079903

SINGAPORE

All Rights Reserved.

© NATURE2WORLD